Compressed-Air Energy Loss: What to Check Before Changing PU Tubing
Changing tube material alone does not establish an energy saving. Start by separating leaks from pressure loss during operation, and compare measurements under the same conditions.

Record the existing conditions
Note the inlet pressure, pressure near the equipment during operation, tube OD and ID, route length, fittings and equipment duty cycle. State the airflow measurement basis when comparing results.
Locate the source of loss
Check connections and the tube for leaks using your facility’s approved inspection process. If pressure falls under load, review tube size, restrictions and the other components before changing the tubing.
Verify any improvement
Compare the same operating cycle, load and pressure settings before and after the change. Report the actual measurements and method rather than assigning a percentage saving to the tube.
Review AISILI PU pneumatic tubing or send AISILI your application requirements.



